MIL-DTL-10215M
4.4 Conformance inspection. Conformance inspection testing (also known as
Acceptance inspection testing) and test sequence is described in table_V and shall include the
Each production lot (see 4.4.1.1) shall include conformance testing as defined herein.
4.4.1 Sampling plan. Unless otherwise specified in 6.2, sampling procedures for
conformance inspection examinations and tests shall be from the inspection lot and in accordance
ANSI/ASQ Z1.4, General Level II.
4.4.1.1 Lot formation. An inspection lot shall consist of all speedometers, tachometers,
flexible shaft assemblies or adapters of a single group, class and PIN, from an identifiable
production period, from one manufacturing location submitted at the same time for acceptance.
TABLE V. Sequence of conformance inspections and testing
Item type
Initial Test
Additional Testing - Test Sequence
Final Test
Test #1
Test #2
Examination of
Performance
Speedometers
Product 4.5.1
& Tachometers
Examination of Operating torque
Waterproofness Performance
Flexible shaft
Product 4.5.1
Assemblies
Examination of
Waterproofness Performance
Adapters
Product 4.5.1
1
applies to Non-Metallic Shaft Assemblies only
12
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business